Hochwasserschutz und Sanierung des Bachlaufes im Dorfzentrum

Dresden, 2007

The Pennrich creek was laid-open and nature-orientated redesigned within the Dresden floodwater care plan in the section of the urban district centre Dresden-Gompitz. The approach for this temporary stream was a preferably wide channel with changing creek bed widths, gentle bank slopes and broad stripes along the banks.

Selective perennial and shrub plantings initiate a vegetation adapted to the site. The connection to the existing near-natural vale space was implemented as rough-textured ramp with coarse rocks. Along the creek a promenade is leading from the centre of the urban district to the Pennrich festival ground, where the creek is to be crossed via a ford. A square is emerging within the crossing area. A framing planting with ash trees is the artistic link between pond and creek.

client: Landeshauptstadt Dresden, Umweltamt area: 0.6 ha completion: 2007
renaturation flood control
Renaturation Pennricher Bach, Dresden
Renaturation Pennricher Bach, Dresden
Renaturation Pennricher Bach, Dresden
Renaturation Pennricher Bach, Dresden
Renaturation Pennricher Bach, Dresden
Renaturation Pennricher Bach, Dresden

related projects

all projects