Berlin, 2025
The existing cycle path and footpath along the river bank as well as the adjacent squares and seating areas along the Landwehr Canal and the Spree were rehabilitated in three construction phases along the entire stretch between Charlottenburger Tor and Schloßbrücke. The approximately 2 kilometre long continuous cycle path was executed in asphalt, the adjoining plaza areas in small stone paving. The existing equipment was renewed, and the existing natural stone walls were partially renovated. Existing trees and shrubs were largely preserved.
klient: Stadt Berlin, Bezirksamt Charlottenburg-Wilmersdorf
rozloha: 0.7 ha
datum realizace: 2025
Fertigstellung 1. BA: 2015
Cyklostezka u řeky Sprévy Berlin-Charlottenburg
Cyklostezka u řeky Sprévy Berlin-Charlottenburg
Cyklostezka u řeky Sprévy Berlin-Charlottenburg
Cyklostezka u řeky Sprévy Berlin-Charlottenburg
Cyklostezka u řeky Sprévy Berlin-Charlottenburg
Cyklostezka u řeky Sprévy Berlin-Charlottenburg
Cyklostezka u řeky Sprévy Berlin-Charlottenburg
Cyklostezka u řeky Sprévy Berlin-Charlottenburg