柏林, 2025年
The existing cycle path and footpath along the river bank as well as the adjacent squares and seating areas along the Landwehr Canal and the Spree were rehabilitated in three construction phases along the entire stretch between Charlottenburger Tor and Schloßbrücke. The approximately 2 kilometre long continuous cycle path was executed in asphalt, the adjoining plaza areas in small stone paving. The existing equipment was renewed, and the existing natural stone walls were partially renovated. Existing trees and shrubs were largely preserved.
甲方: 柏林市夏洛滕堡维尔默斯多夫区政府
面积: 0.7公顷
建成日期: 2025年
Fertigstellung 1. BA: 2015
施普雷河河岸自行车道,柏林-夏洛滕堡
施普雷河河岸自行车道,柏林-夏洛滕堡
施普雷河河岸自行车道,柏林-夏洛滕堡
施普雷河河岸自行车道,柏林-夏洛滕堡
施普雷河河岸自行车道,柏林-夏洛滕堡
施普雷河河岸自行车道,柏林-夏洛滕堡
施普雷河河岸自行车道,柏林-夏洛滕堡
施普雷河河岸自行车道,柏林-夏洛滕堡